Plumber soldering copper pipe in the stone basement of a historic church

Church & Synagogue Plumbing Restoration

Sacred buildings.Honest plumbing.Every phase, disclosed.

We keep century-old baptistries flowing, boiler rooms humming beneath stone naves, and rectory kitchens draining clean — on hands and knees, across tile older than anyone in the congregation.

How We Work

Six phases.
Nothing hidden.

Click any card to see exactly what happens during that phase — the work, the timeline, and a real job photo. By the time you reach the bottom, you'll know us.

01
Assessment
🔦

Initial Walkthrough

We learn the building before we touch it.

Assessment of all mechanical spaces, fixture conditions, and known failure points.

Read more
Plumber with flashlight inspecting copper pipes in a dim stone church basement
Phase 01

Our lead technician walks every mechanical space — boiler room, sacristy utility sink, baptistry, kitchen, and crawlspace — with a camera and a notebook. We photograph every visible pipe run, note the original installation era, flag active leaks, and map drain lines that aren't on any drawing. You receive a written summary within 48 hours.

2–4 hours on site · Written summary in 48 hrs
02
Permitting
📋

Scope & Permit

Historical preservation boards have opinions. So do we.

Permit coordination with municipal and diocesan historical review bodies.

Read more
Building permit documents and architectural drawings spread on a wooden table
Phase 02

Historic buildings often require permits from multiple authorities — the city, the diocese, and sometimes a state preservation office. We've filed with all three simultaneously and know which board needs what language. We handle the paperwork. You sign once. Work doesn't begin until every approval is in hand.

1–3 weeks depending on jurisdiction
03
Demolition
⚒️

Controlled Demolition

Nothing comes out that doesn't need to come out.

Removal of corroded lines with zero damage to tile, stone, or ornamental plaster.

Read more
Close-up of careful pipe removal in a historic building with original tile visible
Phase 03

We cut access panels, not holes. Every tile we remove is numbered, photographed, and stored for reinstallation. We use oscillating tools against stone and hand tools near original plaster. Corroded cast iron gets cut in short sections to avoid vibration damage to surrounding masonry. The floor is cleaner when we leave than when we arrived.

1–5 days depending on scope
04
Installation
🔧

New Installation

Copper where it matters. PEX where it's hidden.

New pipe runs, fixture rough-ins, and drain line replacement to current code.

Read more
New copper pipe installation being soldered in a church mechanical room
Phase 04

We run copper in any space that will ever be seen — sacristies, baptistry chambers, mechanical rooms with exposed ceilings. PEX goes in walls and beneath slabs where it will never be visible. All new lines are labeled and photographed before closing. We install cleanouts every 50 feet on drain lines. Mikvot receive dedicated filtered supply lines with separate shutoffs.

3–10 days depending on system scope
05
Testing
🔬

Pressure Testing

Nothing leaks into a 200-year-old wall on our watch.

Hydrostatic and air pressure tests on every new line before walls close.

Read more
Pressure gauge on newly installed plumbing system showing successful test reading
Phase 05

Every supply line is pressure-tested to 150 PSI and held for 15 minutes before any wall closes. Drain lines are filled to the top of the stack and watched for 30 minutes. We test hot, cold, and recirculation loops independently. Results are documented and provided to the facilities manager along with photos of every closed access panel.

1 day · Full documentation provided
06
Completion

Blessing-Day Ready

The congregation won't know we were here. That's the point.

Final walkthrough, documentation package, and five-year service guarantee.

Read more
Clean restored church interior with no visible evidence of recent plumbing work
Phase 06

We do a final walkthrough with the facilities manager before we close the job. Every access panel is sealed and painted to match. Tile is relaid and grouted. The mechanical room is swept. You receive a full documentation package: as-built drawings, pressure test records, permit closeout, fixture warranty cards, and a recommended maintenance schedule. Our five-year labor guarantee is in writing.

1 day · Documentation package delivered

Every job includes all six phases. We don't skip steps in buildings that can't afford mistakes.

Why Vestry

We've been in buildings most contractors won't quote.

When the baptistry hasn't drained properly since 1987 and the last plumber said it was "too complicated," that's when facilities managers call us.

340+

Religious buildings served

Across 12 dioceses and 4 denominations

47

Years combined experience

In historic preservation plumbing

100%

Permit closeout rate

No job left open with authorities

5-yr

Labor guarantee

In writing, every job

Permitted and reviewed by

Archdiocese of ChicagoEpiscopal Diocese of NYOrthodox UnionIL Historic PreservationNational Trust for Historic Preservation

From the Field

What facilities managers say.

Schedule a Walkthrough

"We had three plumbers walk the sacristy and give us numbers. Vestry was the only one who came back with a written scope that matched what we'd actually described. They knew what a piscina was. That mattered."

18 buildingsCompleted under her portfolio
Portrait of Margaret Hollenbeck, Facilities Director, Archdiocese of Chicago

Margaret Hollenbeck

Facilities Director

Archdiocese of Chicago — 34 parishes

Diocese Facilities

"The mikvah hadn't passed inspection in two cycles. Vestry came in, identified a cross-connection the previous contractor had missed, and had us inspection-ready in eleven days. They understood what was at stake beyond the plumbing."

11 daysMikvah to inspection-ready
Portrait of Rabbi David Kaufman, Executive Director, North Shore Jewish Community Center

Rabbi David Kaufman

Executive Director

North Shore Jewish Community Center, Evanston IL

Synagogue
Plumber working on copper pipe installation in a historic stone church, morning light through stained glass

Ready to Start

Schedule a walkthrough.
We'll do the rest.

No commitment. No quote pressure. A technician who knows historic buildings walks your mechanical spaces and tells you exactly what he sees. You decide what to do with that.

Schedule a Walkthrough